Asset Cost Summary Report

Path: Reports > Asset Cost

A summary of work order costs with Start Date between date range associated with selected assets. Report is grouped by Asset. Need to schedule report to run date range longer than 60 days.

Selection Fields: Building Group, Buildings, Locations, Assets, WO Start Date, WO End Date, Type, Status, Category

Report Columns:

Group Header: Asset Name, Status, Asset Type, Serial Number, Initial Cost, Installation Date, Warranty

Detail: WO #, WO Title, WO Type, Status, Start, Closed, Hours, Labor, Parts, Invoice, Total

Indicates a required field.